Talk:List of commercial nuclear reactors

Page contents not supported in other languages.
From Wikipedia, the free encyclopedia

Netherlands[edit]

There's no new nuclear reactors planned at Borssele. I am removing this section of the table. 86.84.200.125 (talk) 15:48, 30 October 2023 (UTC)[reply]

Canada[edit]

Reference to the little known slowpoke at tunney's pasture http://www.cnsc-ccsn.gc.ca/fr/commission/pdf/trans-03-H14.pdf

St. Lucie plant[edit]

What happened to the St. Lucie NPP? [1] I will research it and add it in. 216.164.138.57 16:31, 24 Jun 2005 (UTC)

Someone will still have to modify the NRC Region 2 template. 216.164.138.57 17:01, 24 Jun 2005 (UTC)

VVER model numbers[edit]

As it stands, some of the VVER reactors are missing model numbers (the part after the slash, VVER-1000/V-320) and the formatting is inconsistent. I found a 2013 brochure[1] by the reactor supplier which has the model numbers for all VVER reactors up until that date on page 13. They're also using the formatting with the slash (not space). I'll be adding the missing models and fixing the formatting if nobody has other suggestions. 2001:999:231:4DB2:D58B:D03:F809:EAC7 (talk) 15:50, 5 June 2023 (UTC)[reply]

If this results in the table distorting itself (line width doubling, for example), consider using a notes column to contain extra details. See the Sweden table. But otherwise any well-sourced details are welcome. Wizmut (talk) 19:51, 5 June 2023 (UTC)[reply]
I've done the edit now. Turns out that the data is also available in PRIS, so no need for additional sources. I cross checked the data and it's consistent. I chose to use the style/formatting from the manufacturer's brochure. 2001:999:250:56EB:9D94:239D:523B:1B39 (talk) 17:35, 17 June 2023 (UTC)[reply]

References

Lianjiang Unit 1 and 2 is already under construction[edit]

Lianjiang Unit 1 and 2 is already under construction.

Lianjiang Unit 1 Begin building at 2022/09/28 https://www.cnnpn.cn/article/32918.html

Lianjiang Unit 2 Begin building at 2023/04/15 https://www.cnnpn.cn/article/36309.html 2001:B011:C040:2444:989B:6271:875:3A3C (talk) 17:45, 13 June 2023 (UTC)[reply]

Lufeng 6 Begin building 26 Aug 2023
Also Shidaowan has 2 Units of CAP1400 under construction since 2019 .
Not be confuse with the 2 new planned Hualong One on the same plant.
They are different Units. 2001:B011:C040:39F9:6DF2:29B0:F883:635B (talk) 17:57, 29 August 2023 (UTC)[reply]
Construction of first unit at Lianjiang under way
https://www.world-nuclear-news.org/Articles/Construction-of-first-unit-at-Lianjiang-under-way
Also the list is missing 2 new planned Hualong One at Shidaowan. 2001:B011:C040:1AD4:F142:B19E:2DF0:4B34 (talk) 18:29, 12 October 2023 (UTC)[reply]
Xudabao Unit 1 began construction at 15 November 2023
https://www.world-nuclear-news.org/Articles/Work-on-Xudabao-unit-1-gets-under-way 2001:B011:C008:1B61:28CC:9261:A1C8:5F27 (talk) 16:20, 16 November 2023 (UTC)[reply]
Zhangzhou unit 3
CNNC has now announced that work on Phase II has commenced, with the pouring of first concrete for the nuclear island of Zhangzhou unit 3 on 22 February.
https://www.world-nuclear-news.org/Articles/Construction-starts-on-second-phase-of-Zhangzhou-p
Jinqimen nuclear power plant
https://www.world-nuclear-news.org/Articles/Preparations-begin-for-new-Chinese-plant 2001:B011:C008:59F2:70E8:8728:1AE2:27AC (talk) 16:53, 22 February 2024 (UTC)[reply]
Shidaowan II-1 and Shidaowan II-2 are currently Under construction , not Planned.
Shidaowan II-1 CAP1400 Construction Start 19 June 2019
https://www.world-nuclear.org/reactor/default.aspx/SHIDAOWAN-1
Shidaowan II-2 CAP1400 Construction Start 21 April 2020
https://www.world-nuclear.org/reactor/default.aspx/SHIDAOWAN-2
Shidaowan Units under const. 2 × 1400 MW
https://en.wikipedia.org/wiki/Shidao_Bay_Nuclear_Power_Plant 2001:B011:C008:1AA2:8172:3AA6:C813:14B6 (talk) 17:54, 27 February 2024 (UTC)[reply]
Unit 2 of the Shin Hanul nuclear power plant in South Korea has entered commercial operation
https://www.world-nuclear-news.org/Articles/Fourth-Korean-APR-1400-begins-commercial-operation 2001:B011:C008:5658:5DB3:8381:66E1:6A1D (talk) 15:21, 8 April 2024 (UTC)[reply]

Sorting tables by dates leaves them out of order.[edit]

Sorting the rows of the tables by date does not work. How can we fix this? 2601:42:C07F:6560:4D2B:141:548E:92A8 (talk) 19:04, 20 April 2024 (UTC)[reply]

This works for me, can you point out the specific table where it's not working? --Ita140188 (talk) 07:17, 23 April 2024 (UTC)[reply]