Elephant & Castle tube station

Coordinates: 51°29′40″N 0°05′59″W / 51.4944°N 0.0997°W / 51.4944; -0.0997
This is a good article. Click here for more information.
From Wikipedia, the free encyclopedia

Elephant & Castle London Underground
The Bakerloo line entrance, with its classic deep-red faience style arches, with the modern glass-sided and glass-topped flat-roofed extension abutting the original western elevation.
The Bakerloo line entrance, showing its design features with shops and the entrance to the far right
Elephant & Castle is located in Central London
Elephant & Castle
Elephant & Castle
Location of Elephant & Castle in Central London
LocationElephant and Castle, Newington
Local authorityLondon Borough of Southwark
Managed byLondon Underground
OwnerLondon Underground
Number of platforms4
AccessibleYes (Northern line southbound only)[1][2]
Fare zone1 and 2
OSIElephant & Castle National Rail[3]
London Underground annual entry and exit
2018Decrease 20.71 million[4]
2019Decrease 19.75 million[5]
2020Decrease 8.56 million[6]
2021Decrease 7.88 million[7]
2022Increase 13.30 million[8]
Key dates
18 December 1890 (18 December 1890)Opened (C&SLR)
5 August 1906Opened (BS&WR)
Other information
External links
Coordinates51°29′40″N 0°05′59″W / 51.4944°N 0.0997°W / 51.4944; -0.0997
 London transport portal

Elephant & Castle is a London Underground station in the London Borough of Southwark in south London. It is on the Bank branch of the Northern line between Borough and Kennington stations. It is also the southern terminus of the Bakerloo line and the next station towards north is Lambeth North. The station is in both Travelcard Zones 1 and 2.[9] The Northern line station was opened in 1890 by the City and South London Railway (C&SLR) while the Bakerloo line station was opened sixteen years later by the Baker Street and Waterloo Railway (BS&WR). There is an out-of-station interchange with the nearby Elephant & Castle National Rail station.[3]

A girl born at the station in 1924 was the first baby to be born on the Underground network.[10] The Bakerloo line building remains much as originally constructed and is a typical Leslie Green structure.[11] The Northern line building was designed by Thomas Phillips Figgis,[12] and was rebuilt several times until the current structure opened in 2003. Transport for London (TfL) is currently planning a major upgrade to the station. A Bakerloo line extension south to Camberwell was planned and approved in 1931 but construction never started. Similar proposals have been revived on several occasions; in 2014 TfL ran a consultation on an extension to Hayes and Beckenham Junction, which is still under consideration.

The station today[edit]

Geography[edit]

The statue depicting the name 'Elephant & Castle' next to the Northern line entrance

Elephant & Castle is located in the Elephant and Castle area of Newington in the London Borough of Southwark in central London.[13] The station is in both Travelcard Zones 1 and 2[9] and is on the Bank branch of the Northern line between Kennington and Borough stations, and is the southern terminus of the Bakerloo line, the next station being Lambeth North.[9] The station has two surface buildings, separated by a large traffic intersection.[13][note 1] The northern building provides the most direct access to the Bakerloo line, while the southern one is linked more directly to the Northern line.[14]

Station buildings[edit]

Access to the more northerly (Bakerloo) part of the station is via the original building, while the exit is via a new extension next to Skipton House. Between the entrance and two shops is the entrance to South London House, an office block above the station.[15][16] The BS&WR station building remains much as originally constructed and is a typical Leslie Green structure.[11] The main alteration is a modern glass-sided and glass-topped flat-roofed extension abutting the original western elevation, giving access to three of the six arches. These arches, in a classic deep-red faience style,[15] formed the original perimeter: two are infilled with street-facing shops. As the station also functions as a drivers' depot, London Underground uses the offices above the station for administration and drivers' accommodation.[15]

The C&SLR station was designed by Thomas Phillips Figgis[12] in a similar style to Kennington station.[17] It was partially rebuilt in the 1920s[18] when the C&SLR tunnels were modernised, and was rebuilt during the construction of the Elephant & Castle shopping centre and roundabout in the 1960s.[12][19] This Northern line ticket hall was rebuilt at the start of the 21st century, reopening on 12 December 2003 following 2 years of upgrade work.[20]

Neither the Northern line or Bakerloo line ticket halls have escalators.[21][22] To get from either ticket hall to the platforms it is necessary to use the lifts or spiral stairs.[23][note 2] The southern (Northern line) building has lifts from street level down to the level of the southbound Northern line platform, the only step-free platform at the station.[1][2] From inside the station, the northern exit is labelled "London South Bank University"[24] and emerges at the southern tip of the triangular campus.[13][note 3] The southern exit is labelled "Shopping Centre" and also leads to the National Rail station[24] where there is an out-of-station interchange, allowing Oyster card and contactless payment card users to interchange while paying a single fare for their journey.[3]

Heritage feature and refurbishment[edit]

The multi-coloured platform tiles on the Northern line were reconstructed in the 1920s in conjunction with an extension to Morden station.[12] The tiles were carefully replicated in 2006 to replace the originals, which were in poor condition.[12] The original C&SLR tiles dating from 1890 remain on the tunnel roofs of the Northern line platforms, albeit now covered over by the new cable-management system.[12][note 4] The station was refurbished in 2007.[25] The original maroon and cream tiling on the Bakerloo line platforms has been covered over.[25] Because of the arrangement of the lighting, cabling and public address loudspeakers, it was not possible to arrange the new roundels at alternate 'low' and 'high' positions, all being at the lower level.[12][25][26][note 5]

Services and connections[edit]

Bakerloo line[edit]

The station is the southern terminus of the Bakerloo line, with northbound trains terminating at either Queen's Park, Stonebridge Park or Harrow & Wealdstone.[27]

The typical service pattern in trains per hour (tph) is:[28]

  • 6tph to Harrow & Wealdstone[27]
  • 3tph to Stonebridge Park[27]
  • 5tph to Queen's Park

Northern line[edit]

A Northern line train at the southbound platform looking south.

On this line, the station is on the Bank or City branch; the next stations are Borough to the north and Kennington to the south.[9] The typical off-peak service (as of January 2015) in trains per hour (tph) is 10tph northbound to each of High Barnet[29][30] and Edgware[29][30] and 20tph southbound to Morden.[29][31]

Connections[edit]

London Bus routes 1, 12, 35, 40, 45, 53, 63, 68, 133, 136, 148, 155, 171, 172, 176, 188, 196, 333, 343, 344, 360, 363, 415, 453, 468, C10 and P5,[32] including night routes N1, N53, N63, N68, N89, N133, N155, N171 and N343, stop outside the station at either Newington Butts (Northern line entrance) or London Road (Bakerloo line entrance). [33] In addition, bus routes 12, 35, 148, 176, 188, 344 and 453 provide a 24-hour bus service.[32][33]

History[edit]

Northern line[edit]

Between 1883 and 1886, a route was planned by the City and South London Railway (C&SLR), then known as the City of London & Southwark Subway (CL&SS), from King William Street via Elephant & Castle[34] to Stockwell[35][36] and Clapham Common.[37] The entire route was approved on 25 July 1890[38][note 6] and the station opened on 18 December 1890 as part of the first successful deep-level tube railway. It ran between King William Street and Stockwell.[29]

In November 1891, the C&SLR recognised the deficiencies of the section between Borough station and King William Street. A new route was chosen with a different pair of tunnels, avoiding this section.[39] Near Borough, the new tunnels would branch off to London Bridge to form an interchange with the mainline station and then north through the City of London to Angel.[39] The plan was approved on 24 August 1893[40] following a delay.[41] The Act also incorporated another bill of 1893[42] to grant more time to build the southern extension to Clapham.[41][note 7] The new route and the first section of the northern extension from Borough to Moorgate opened on 25 February 1900, and the King William Street diversion was closed.[43] The southern extension to Clapham Common opened on 3 June 1900.[44] Work continued on the rest of the northern extension and it opened on 17 November 1901.[44]

In 1912, the C&SLR submitted another bill to increase its capacity by enlarging its tunnels to the larger diameter used for the tunnels of the more recently built railways to allow larger, more modern rolling stock to be used.[45][note 8] Together, the works proposed in these bills would enable the Charing Cross, Euston and Hampstead Railway (CCE&HR)'s trains to run over the C&SLR's route and vice versa, effectively combining the two separate railways. Tunnel enlargement works only restarted after World War I when an extension of time was granted in February 1919.[47][note 9] The Moorgate to Clapham Common section reopened on 1 December 1924, approximately eight months after the rest of the line.[49][note 10]

Route diagram which shows the route from Paddington to Elephant & Castle.

Bakerloo line[edit]

In November 1891, a private bill was presented to Parliament for the construction of the Baker Street and Waterloo Railway (BS&WR).[50] The railway was planned to run entirely underground from Marylebone[51] to Elephant & Castle[52] via Baker Street and Waterloo[50] and was approved in 1900.[53][54] Construction commenced in August 1898[55] under the direction of Sir Benjamin Baker, W.R. Galbraith and R.F. Church[56] with building work by Perry & Company of Tredegar Works, Bow.[56][note 11] Test trains began running in 1905.[60] The first section of the BS&WR was between Baker Street and Lambeth North.[61] The BS&WR station opened on 5 August 1906, almost five months after the rest of the line.[61]

Incidents[edit]

On the morning of 27 November 1923, a slight misjudgement at the end of the tunnel enlargement work left the tunnel unstable near Borough.[29] A collapse on the same day, caused when a train hit temporary shoring near Elephant & Castle, filled the tunnel with wet gravel.[29][48] Later a gas main exploded, causing a water main to break and leaving a water-filled crater in the middle of the street.[29] The line was briefly split in two, but was completely closed on 28 November 1923.[29][48]

A girl born at the station on 13 May 1924 was the first baby to be born on the Underground network.[62][63] According to initial press reports, she had been named Thelma Ursula Beatrice Eleanor (so that her initials would be T.U.B.E.) but this later proved false: her actual name was Mary Ashfield Eleanor Hammond.[62][63] Her second name Ashfield was from Lord Ashfield, chairman of the railway, who agreed to be the baby's godfather, but said that "it would not do to encourage this sort of thing as I am a busy man."[62][63]

Station upgrade and expansion[edit]

The interchange between the Bakerloo and Northern lines has long been criticised by local residents for its lack of escalators, its winding passageways and its two separate station entrances.[64] Given the increased demand on the Underground station from proposed and under-construction residential development, Southwark Council has called for the expansion and redevelopment of the station, noting in 2008 that it was the "final hurdle" of a deal to redevelop the Shopping Centre.[65] In 2018, the redevelopment of the Elephant and Castle Shopping Centre was approved, with a new station entrance as part of the proposal.[66]

The upgrade and expansion work will include a new station entrance and ticket hall facing Elephant Square, three new escalators, and lifts providing step-free access to the Northern line platforms.[67] The new entrance would also improve the interchange between the Underground and Elephant & Castle railway station, with a more direct route through the new development.[68] The shell of the new ticket hall will be constructed by the developer Delancey; TfL and Southwark Council will share the £15m cost of connecting the shell to the existing platforms and to "fit out" the new ticket hall with escalators and lifts.[69] The Shopping Centre closed in September 2020, allowing construction work to begin.[70] The new ticket hall is scheduled to open in 2028/9.[71]

The new ticket hall has been designed to accommodate the proposed Bakerloo line extension. New Bakerloo tunnels would be dug along with new platforms to accommodate the increase in demand if the Bakerloo line extension comes into service.[72][73]

Proposals for the future[edit]

Bakerloo line extension to southeast London[edit]

An extension to Camberwell from Elephant & Castle was planned and approved in 1931.[74][75] Elephant & Castle was also to be reconstructed with a third platform to provide the additional reversing capacity, along with a new ticket hall and escalators. Due to the need to prioritise the extension from Baker Street to Finchley Road, to relieve congestion on the Metropolitan line, as well as financial constraints and the outbreak of the Second World War, no work was carried out on the extension.[76][note 12] In the 1950s there was a brief revival of the plan, in which it was proposed that Elephant & Castle would not be altered and the additional turn-round capacity would be provided by making Camberwell a three-platform terminus. The project was ultimately unaffordable owing to post-war austerity, reduced demand, and the disproportionately high cost of the project with a three-platform deep-level terminus and the requirement for new trains and a depot.[80]

During 2005–06, a Bakerloo extension was proposed with three route options.[81] The options were extensions to Hayes via Peckham Rye, Beckenham Junction via Camberwell, or Hayes via New Cross.[82] In July 2011, Network Rail recommended an extension of the Bakerloo line from Elephant & Castle to Lewisham, where it would take over the line to Hayes.[83][84][note 13] In September 2014, Transport for London ran a consultation on the Bakerloo extension to Hayes and Beckenham Junction with options via Lewisham and Camberwell or Old Kent Road, taking over Network Rail's Hayes line.[87] The cost of the extension is estimated at around £2–3 billion with construction expected to take place between the mid-2020s and early 2030s.[88][note 14] A February 2017 consultation indicates that the line could extend to Lewisham via Old Kent Road with future extension options later on.[90]

Notes and references[edit]

Notes[edit]

  1. ^ The two lines were owned by separate companies at first and not integrated until an underground passageway opened on 10 August 1906.[12]
  2. ^ There are 117 steps to the Bakerloo line platforms (though the signs incorrectly state 124)[23] and 111 to the Northern line.[23] The northern building has three lifts while the southern has only two.[21]
  3. ^ Some but not all exit signs also mention the Imperial War Museum.[24]
  4. ^ Rarer still are the last surviving pattern tiles still in place on the walls of the Northern line's spiral staircase.[12]
  5. ^ The replicated multi-coloured tiles also resulted in the realignment of the roundels.[12]
  6. ^ The act was published on 25 July 1890 as the City and South London Railway Act, 1890. At the same time, the company's name was changed from CL&SS to C&SLR.[38]
  7. ^ The new tunnels permitted by the 1895 Act enabled the track layout at King William Street station to be modified to a single central platform with a track each side. This was opened as a temporary measure while funds for the extensions were raised.[43]
  8. ^ A separate bill was published at the same time by the London Electric Railway (a company formed by the UERL in 1910 through a merger of the BS&WR, Great Northern, Piccadilly and Brompton Railway and CCE&HR), which included plans to construct tunnels to connect the C&SLR at Euston to the CCE&HR's station at Camden Town.[46]
  9. ^ The work involved expanding the tunnel rings by removing several of the cast iron segments from each tunnel ring, excavating a void behind to the required new diameter and reinstalling the segments with additional packing spacers.[29] The section between Euston and Moorgate was closed from 8 August 1922, but the rest of the line remained open with enlargement works taking place at night.[29][48]
  10. ^ The Euston to Moorgate section reopened on 20 April 1924, along with the new tunnels linking Euston to Camden Town.[49] A train collision on 27 November 1923 caused the Moorgate to Clapham Common section to close.[29][48]
  11. ^ By November 1899, the northbound tunnel reached Trafalgar Square and work on some of the station sites was started, but the collapse of the L&GFC in 1900 led to works gradually coming to a halt. When the UERL was formed in April 1902, 50 per cent of the tunnelling and 25 per cent of the station work was completed.[57] With funds in place, work restarted and proceeded at a rate of 73 feet (22.25 m) per week,.[58] By February 1904, most of the tunnels and underground parts of the stations between Elephant & Castle and Marylebone were complete and works on the station buildings were in progress.[59] The additional stations were incorporated as work continued elsewhere.[60]
  12. ^ The 1931 enabling powers were renewed by the Government in 1947 under the Special Enactments (Extension of Time) Act, 1940,[77] and the projected extension as far as Camberwell even appeared on a 1949 edition of the Underground map, but no further work was done.[78] Train indication signs showing Camberwell as a destination were created in anticipation of the southern extension and erected in some Tube stations; these signs were still visible at Warwick Avenue station until the 1990s.[79]
  13. ^ This recommendation was noted as requiring further work, and to be delivered on a timescale to be determined.[85] In March 2012 Lewisham Council's consultant on the Bakerloo extension advised: "There is a good to strong, but not overwhelming case for a Bakerloo extension",[86] explaining that many other rail projects in the London area were higher priority, and there was a lack of clarity on the best value route for a Bakerloo extension.
  14. ^ The results of this consultation are planned for release during Spring 2015, but the London Boroughs of Southwark, Lewisham and Greenwich, local MPs and London Assembly members have signed a letter supporting this extension.[89]

References[edit]

  1. ^ a b "Step free Tube Guide" (PDF). Transport for London. April 2021. Archived (PDF) from the original on 15 May 2021.
  2. ^ a b "Avoiding stairs Tube guide" (PDF). Transport for London. May 2020. Archived (PDF) from the original on 27 November 2020.
  3. ^ a b c "Out-of-Station Interchanges" (Microsoft Excel). Transport for London. 2 January 2016. Retrieved 28 August 2016.
  4. ^ "Station Usage Data" (CSV). Usage Statistics for London Stations, 2018. Transport for London. 23 September 2020. Archived from the original on 14 January 2023. Retrieved 11 October 2023.
  5. ^ "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2019. Transport for London. 23 September 2020. Archived from the original on 9 November 2020. Retrieved 9 November 2020.
  6. ^ "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2020. Transport for London. 16 April 2021. Retrieved 1 January 2022.
  7. ^ "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2021. Transport for London. 12 July 2022. Retrieved 7 September 2022.
  8. ^ "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2022. Transport for London. 4 October 2023. Retrieved 10 October 2023.
  9. ^ a b c d Standard Tube Map (PDF) (Map). Not to scale. Transport for London. November 2022. Archived (PDF) from the original on 7 November 2022. Retrieved 12 November 2022.
  10. ^ Malvern, Jack (3 January 2009). "Transports of delight: Girl born on the Tube". The Times. London. Retrieved 1 December 2015.
  11. ^ a b Wolmar 2005, p. 175.
  12. ^ a b c d e f g h i j Wright, Ian (2 March 2013). "Elephant & Castle heritage information". Flickr. Archived from the original on 8 December 2015. Retrieved 5 December 2015.
  13. ^ a b c "Elephant & Castle tube station". Google Maps. Retrieved 2 December 2015.
  14. ^ David, Lew. "Elephant & Castle". London Moving. Archived from the original on 22 December 2015. Retrieved 12 December 2015.
  15. ^ a b c Baxter & Lock 2014, p. 71.
  16. ^ "Elephant & Castle Underground Station". LTM Collection. London Transport Museum. 1925. Archived from the original on 8 December 2015. Retrieved 4 December 2015.
  17. ^ "Elephant & Castle Underground Station (Ukn)". LTM Collection. London Transport Museum. 1914. Archived from the original on 8 December 2015. Retrieved 5 December 2015.
  18. ^ "Elephant & Castle Underground Station (U41908)". LTM Collection. London Transport Museum. 1934. Archived from the original on 8 December 2015. Retrieved 5 December 2015.
  19. ^ H K, Nolan (4 June 1966). "Elephant & Castle Underground Station (5255/R/1)". LTM Collection. London Transport Museum. Archived from the original on 8 December 2015. Retrieved 5 December 2015.
  20. ^ "Northern line ticket hall at Elephant & Castle reopens" (Press release). London Underground. 12 December 2003. Archived from the original on 11 April 2004. Retrieved 10 March 2020.
  21. ^ a b Feather, Clive (15 November 2014). "Vertical Transport". Clive's Underground Line Guides. Retrieved 11 December 2015.
  22. ^ "Tube Stations that have no escalators and use lifts to get down to the platforms". Tube Facts and Figures. Geofftech. Archived from the original on 8 December 2015. Retrieved 3 December 2015.
  23. ^ a b c "Tube stations with steps". Tube Facts and Figures. Geofftech. Archived from the original on 22 February 2017. Retrieved 3 December 2015.
  24. ^ a b c liam, victor (15 May 2006). "Way Way Way Out". Flickr. Archived from the original on 8 December 2015. Retrieved 8 December 2015.
  25. ^ a b c "Station Refurbishment Summary" (PDF). London Underground Railway Society. July 2007. Retrieved 3 December 2015.
  26. ^ "Elephant & Castle Underground Station". Flickr. bowroaduk. 22 July 2008. Archived from the original on 8 December 2015. Retrieved 3 December 2015.
  27. ^ a b c "CULG - Bakerloo Line". Davros.org. Clive's UndergrounD Line Guides. 20 June 2017. Retrieved 14 July 2017.
  28. ^ "Bakerloo Line Working Timetable No. 40" (PDF). Transport for London. 17 May 2015. Archived from the original (PDF) on 9 January 2016. Retrieved 18 August 2016.
  29. ^ a b c d e f g h i j k Feather, Clive (27 January 2015). "Northern line". Clive's Underground Line Guides. Archived from the original on 8 December 2015. Retrieved 1 December 2015.
  30. ^ a b "Northern line timetable: From Elephant & Castle Underground Station to Borough Underground Station". Transport for London. Retrieved 2 December 2015.
  31. ^ "Northern line timetable: From Elephant & Castle Underground Station to Kennington Underground Station". Transport for London. Retrieved 2 December 2015.
  32. ^ a b "Buses from Elephant & Castle" (PDF). Transport for London. 29 April 2023. Archived (PDF) from the original on 5 May 2023. Retrieved 6 May 2023.
  33. ^ a b "Night Buses from Elephant & Castle" (PDF). Transport for London. September 2021. Archived (PDF) from the original on 5 May 2023. Retrieved 6 May 2023.
  34. ^ "No. 25291". The London Gazette. 27 November 1883. pp. 6066–6067.
  35. ^ "No. 25649". The London Gazette. 26 November 1886. pp. 5866–5867.
  36. ^ "No. 25721". The London Gazette. 15 July 1887. p. 3851.
  37. ^ "No. 25995". The London Gazette. 22 November 1889. pp. 6361–6362.
  38. ^ a b "No. 26074". The London Gazette. 29 July 1890. p. 4170.
  39. ^ a b "No. 26226". The London Gazette. 24 November 1891. pp. 6349–6351.
  40. ^ "No. 26435". The London Gazette. 25 August 1893. p. 4825.
  41. ^ a b Badsey-Ellis 2005, p. 61.
  42. ^ "No. 26348". The London Gazette. 25 November 1892. p. 6840.
  43. ^ a b Day & Reed 2008, p. 46.
  44. ^ a b Day & Reed 2008, p. 47.
  45. ^ "No. 28665". The London Gazette. 22 November 1912. pp. 8802–8805.
  46. ^ "No. 28665". The London Gazette. 22 November 1912. pp. 8798–8801.
  47. ^ "No. 31180". The London Gazette. 14 February 1919. pp. 2293–2296.
  48. ^ a b c d Wolmar 2005, pp. 223–24.
  49. ^ a b Day & Reed 2008, p. 94.
  50. ^ a b "No. 26225". The London Gazette. 20 November 1891. pp. 6145–6147.
  51. ^ "No. 26767". The London Gazette. 11 August 1896. pp. 4572–4573.
  52. ^ Badsey-Ellis 2005, pp. 84–85.
  53. ^ Badsey-Ellis 2005, p. 56.
  54. ^ "No. 27218". The London Gazette. 7 August 1900. pp. 4857–4858.
  55. ^ Wolmar 2005, p. 168.
  56. ^ a b Lee, Charles E. (March 1956). "Jubilee of the Bakerloo Railway – 1". The Railway Magazine. pp. 149–156.
  57. ^ "The Underground Electric Railways Company Of London (Limited)". The Times. No. 36738. 10 April 1902. p. 12. Retrieved 2 December 2015.
  58. ^ Day & Reed 2008, p. 69.
  59. ^ "Railway And Other Companies – Baker Street and Waterloo Railway". The Times. No. 37319. 17 February 1904. p. 14. Retrieved 2 December 2015.
  60. ^ a b Wolmar 2005, p. 173.
  61. ^ a b Feather, Clive (30 December 2014). "Bakerloo line". Clive's Underground Line Guides. Archived from the original on 8 December 2015. Retrieved 2 December 2015.
  62. ^ a b c Stephen Halliday (2012), Amazing & Extraordinary London Underground Facts, David & Charles, p. 121, ISBN 9781446356654
  63. ^ a b c David Long (2010), Little Book of the London Underground, The History Press, p. 155, ISBN 9780752462363
  64. ^ "Who should pay for Elephant & Castle's new £160 million tube station?". London SE1. 17 May 2011. Retrieved 30 September 2020.
  65. ^ "Elephant & Castle: tube station refurb cost is "final major hurdle" to regeneration deal". London SE1. 31 October 2008. Retrieved 30 September 2020.
  66. ^ "Elephant and Castle shopping centre demolition gets final approval". BBC News. 11 December 2018. Retrieved 30 September 2020.
  67. ^ "Have your say on the Bakerloo line extension - Elephant & Castle Combined Station Entrance" (PDF). Transport for London. 14 October 2019. Archived from the original (PDF) on 1 October 2021. Retrieved 30 September 2020.
  68. ^ "Further plans for Bakerloo line extension revealed following public consultation" (Press release). Transport for London. 12 September 2018. Retrieved 30 September 2020.
  69. ^ "Council agrees additional funding for the first piece of infrastructure to deliver the Bakerloo Line Extension at Elephant and Castle" (Press release). London Borough of Southwark. 31 January 2020. Retrieved 30 September 2020.
  70. ^ Gayle, Damien (24 September 2020). "'We're going to miss the community': Elephant and Castle shopping centre closes after 55 years". The Guardian. London. Retrieved 30 September 2020.
  71. ^ "New images of Elephant & Castle's upgraded tube station". London SE1. 9 October 2020. Retrieved 17 October 2020.
  72. ^ "Transport for London consults on latest Bakerloo Line extension plans". Railway Gazette International. London. 14 October 2019. Retrieved 30 September 2020.
  73. ^ "Background to Consultation Report Updated" (PDF). Transport for London. February 2017. p. 10. Archived (PDF) from the original on 23 May 2017. Retrieved 23 May 2017.
  74. ^ "No. 33699". The London Gazette. 17 March 1931. pp. 1809–1811.
  75. ^ "No. 33761". The London Gazette. 9 October 1931. p. 6462.
  76. ^ Horne 2001, pp. 40–41.
  77. ^ "No. 38145". The London Gazette. 12 December 1947. p. 5876.
  78. ^ "History of the London Tube Map, 1949 tube map". London Transport. June 1949. Archived from the original on 25 January 2008. Retrieved 4 December 2015.
  79. ^ Garland 1994, p. 41.
  80. ^ Horne 2001, p. 51.
  81. ^ "Transport 2025: transport challenges for a growing city". Transport for London. Archived from the original on 5 September 2012. Retrieved 5 December 2015.
  82. ^ "Extending the Bakerloo: Investigations and Options". London Reconnections (blog). 27 August 2009. Archived from the original on 23 August 2012. Retrieved 5 December 2015.
  83. ^ "London and South East Route Utilisation Strategy" (PDF). Network Rail. July 2011. p. 157. Archived from the original (PDF) on 27 November 2011. Retrieved 5 December 2015.
  84. ^ Broadbent, Steve (10 August 2011). "London RUS suggests fifth track on South West line". Rail. Peterborough. p. 8.
  85. ^ "London & South East RUS Summary of RUS recommendations and supporting information" (PDF). Network Rail. 4 January 2012. Retrieved 5 December 2015.
  86. ^ "Integrated Transport – Bakerloo Line Extension" (PDF). London Borough of Lewisham. 25 April 2012. para 4.14. Archived from the original (PDF) on 5 March 2016. Retrieved 5 December 2015.
  87. ^ "Bakerloo Line Extension". Transport for London. September 2014. Archived from the original on 23 September 2021. Retrieved 5 December 2015.
  88. ^ "Bakerloo Line Extension – Frequently Asked Questions" (PDF). Transport for London. September 2014. p. 2. Archived from the original (PDF) on 9 October 2014. Retrieved 5 December 2015.
  89. ^ Chandler, Mark (1 December 2014). "Lewisham Council backs Bakerloo Line extension to borough". News Shopper. Bromley. Retrieved 5 December 2015.
  90. ^ "Background to Consultation Report Updated" (PDF). Transport for London. February 2017. Archived (PDF) from the original on 23 May 2017. Retrieved 23 May 2017.

Further reading[edit]

  • Badsey-Ellis, Antony (2005). London's Lost Tube Schemes. Capital Transport. ISBN 1-85414-293-3.
  • Baxter, Mark; Lock, Darren (2014). Walworth Through Time The Second Collection. Amberley Publishing. ISBN 978-1-44563-198-1.
  • Day, John R; Reed, John (2008) [1963]. The Story of London's Underground. Capital Transport. ISBN 978-1-85414-316-7.
  • Garland, Ken (1994). Mr Beck's Underground Map. Capital Transport. ISBN 1-85414-168-6.
  • Horne, Mike (2001). The Bakerloo Line. Capital Transport. ISBN 1-85414-248-8.
  • Wolmar, Christian (2005) [2004]. The Subterranean Railway: How the London Underground Was Built and How It Changed the City Forever. Atlantic Books. ISBN 1-84354-023-1.

External links[edit]

Preceding station London Underground Following station
Lambeth North Bakerloo line Terminus
Borough Northern line
Bank Branch
Kennington
towards Morden